THE CNC BUYER’S NOTEBOOK

Five checks before comparing CNC quotes.

Molitech   /   Quotation & project communication   /   3 min read

If five factories quoted the same CNC drawing and the prices differed by 30% or more, what would you check first?

Start with what each price covers. Machining routes, equipment efficiency and risk allowances can affect cost, but first establish whether the suppliers are quoting the same delivery and acceptance requirements.

Machining photo
CHECK 01

Drawing revision and material

Confirm that each quote uses the same released drawing and matching model. Specify the material grade, applicable standard and supply condition, plus any required material certificate. A description such as "aluminium part" leaves room for different assumptions. Resolve drawing-model conflicts before comparing offers.

CHECK 02

Quantity and one-time charges

Align order quantity, batch sizes and delivery arrangements. Ask whether programming, fixtures and other one-time charges are included in the unit price or listed separately. For repeat orders, confirm which charges would apply again. A prototype quote and a production-batch quote need different cost comparisons.

CHECK 03

Acceptance and inspection

Use the same approved tolerances and acceptance requirements. Agree which features will be inspected, the inspection scope and the records supplied with the parts. Do not assume that a promise to meet a tolerance includes a particular report. Any proposed deviation needs the buyer’s approval before it becomes the order basis.

CHECK 04

Finishing and delivery condition

Check specified heat treatment, surface finishing, deburring, cleaning and packaging. Make clear whether critical dimensions are accepted after the final treatment. If an operation is not listed, ask whether it is included, excluded or simply needs clarification. An unclear quote is a question to resolve, not proof of an omission.

CHECK 05

Timing and commercial scope

Define when lead time starts and whether it ends at production completion, dispatch or arrival. Align currency, quote validity, payment terms, freight and tax scope. Where a trade term is used, state its version and named place. A unit price alone does not show the full delivery arrangement.

Compare the scope, then the price

Put inclusions, exclusions and open questions side by side. Once the scope is aligned, ask suppliers to explain the remaining price differences. Different setups or machines can meet the same requirements unless a process is specified. A higher price does not prove reliability; a lower price does not prove that something is missing.

Inspection photo
One practical next step: ask each supplier to mark what is included, what is excluded and what still needs clarification against the same requirement list.

Have a drawing to discuss?

Molitech supplies build-to-print machined parts through independent partner manufacturers. We clarify drawing questions, agreed inspection documents and delivery scope before the order, giving you a clear basis for reviewing our quotation.

Leave a few details and we will contact you by email.

Discuss your drawing

Email PDF drawings showing dimensions, tolerances and the released revision to liwen@molitech-eng.com. A STEP model can be supplied later if needed.

Prepare a quotation enquiry